Document Type

Report

Publisher

United States. Department of Energy

Rights and Access Note

Rights assessment remains the responsibility of the researcher. No known restrictions on publication. For information about the process and fees for obtaining higher resolution scans or another file format, contact Special Collections.

Publication Date

1978

Publisher location

Bangor, ME

Abstract/ Summary

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System.

Citation/Publisher Attribution

United States. 1978. Dickey-Lincoln School Lakes transmission project: Draft environmental impact statement.

Version

publisher's version of the published document

Share

 

Rights Statement

No Copyright - United States