Document Type
Report
Publisher
U.S. Department of Energy
Rights and Access Note
Rights assessment remains the responsibility of the researcher. No known restrictions on publication. For information about the process and fees for obtaining higher resolution scans or another file format, contact Special Collections.
Publication Date
1978
Publisher location
Bangor, ME
Abstract/ Summary
This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New England grid, and describes the study area involved. It supplements the Transmission System PI anning Study prepared by the Department of Interior (DOI) (February 1977) and the Assessment of Alternative Power Transmission Corridors prepared by VTN Consolidated (VTN) of Boston Mass., for the Dickey-Lincoln School Lakes project.
Repository Citation
U.S. Department of the Interior and U.S. Department of Energy, "Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix D: Transmission Reconnaissance Study" (1978). Dickey-Lincoln School Lakes Project. 40.
https://digitalcommons.library.umaine.edu/dickey_lincoln/40
Citation/Publisher Attribution
United States. 1978. Dickey-Lincoln School Lakes Project transmission studies environmental impact statement: appendix D: transmission reconnaissance study. Bangor, Me: U.S. Dept. of Energy.
Version
publisher's version of the published document
01-B
Transmission_Reconnaissance_C_pt1.pdf (31695 kB)
C_pt1
Transmission_Reconnaissance_C_pt2.pdf (49839 kB)
C_pt 2