Document Type

Report

Publisher

Margaret Chase Smith Policy Center, University of Maine

Rights and Access Note

This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. In addition, no permission is required from the rights-holder(s) for non-commercial uses. For other uses you need to obtain permission from the rights-holder(s).

Publication Date

9-23-2022

Publisher location

Orono, ME

Abstract/ Summary

The past two years have been a challenging time for both firms and state authorities in Maine’s highway and bridge construction industry. This report examines the factors affecting bid inflation for highway and bridge projects in Maine. It explores trends in contract bidding behavior, construction cost inflation, supply side challenges in Maine, and competition in Maine’s public roadways paving industry.

Version

post-print (i.e. final draft post-refereeing with all author corrections and edits)

Share

 

Rights Statement

In Copyright - Educational Use Permitted.