Document Type

Report

Publisher

United States Army Corps of Engineers

Rights and Access Note

Rights assessment remains the responsibility of the researcher. No known restrictions on publication. For information about the process and fees for obtaining higher resolution scans or another file format, contact Special Collections.

Publication Date

1976

Publisher location

Waltham, MA

Abstract/ Summary

This design memorandum presents the results of current engineering and economic analyses which serve as the basis for the selection of the recommended hydro-power installation at the Dickey-Lincoln School Lakes project. The report includes a summary of data pertinent to hydropower features of the project, projections of electricity needs for the New England Power Supply Areas, a description of the recom-mended power plan and facilities, pertinent data associated with power regulation studies, and the economic and engineering rationale for capacity optimization.

Citation/Publisher Attribution

United States. 1976. Dickey-Lincoln School Lakes, Maine, U.S.A. and Quebec, Canada: design memorandum no. 3: hydropower capacity and project economic. Waltham, Mass: U.S. Army Corps of Engineers, New England Division.

Version

publisher's version of the published document

Share

 

Rights Statement

No Copyright - United States